Excavation Estimate Checklist: What to Have Before You Call
Before you request an excavation estimate, gather the parcel number and plat, your house plans or footprint, the septic design or perc results, your driveway permit status, a utility plan for power, gas, and water, photos of the lot, access notes, your timeline, and a budget range. With those in hand, a contractor prices your actual job instead of a guess, and two bids come back comparable.
An estimate is only as good as the information behind it. When an excavator has to guess at the house size, the septic type, or the driveway length, the guess shows up later as an allowance, a padded number, or a change order. Our guide to reading an excavation estimate covers what comes back. This one covers what to send.
The excavation estimate checklist
Print this, fill in what you have, and send it with your request.
- Parcel number and legal description
- Recorded plat, and a survey if you have one
- House plans, or the footprint, foundation type, and planned location on the lot
- Septic design, perc test results, or the date a test is scheduled
- Driveway permit status, and whether the road is borough, state, or private
- Power plan: Homer Electric application status
- Gas plan: whether ENSTAR serves the lot
- Water plan: well location, or city water and sewer
- Photos of the road approach, building site, and any wet or steep spots
- Access notes: gates, overhead lines, road maintenance, load limits
- Timeline: target start, and what has to happen first
- Budget range
Parcel number, plat, and survey
The parcel number lets the estimator pull your lot on the borough's online maps before the site visit. The borough's wetlands and contours map service carries 4-foot contours drawn from LiDAR, which show the slope from the road to the building site, plus a wetlands layer and tax parcels.
The plat shows lot lines, easements, and setback notes. Outside the cities, most borough plats since 1968 carry a 20-foot building setback from street rights-of-way. If the house will sit anywhere near a line or a setback, a survey with staked corners keeps the pad from landing in the wrong place. A pad in the wrong place is the most expensive mistake on this list.
House plans or footprint
The house sets the size of the pad and the depth of the dig. A slab, a crawlspace, and a full basement are three different excavation jobs. In Kenai, footings go at least 42 inches deep for frost, so a basement or crawlspace changes the volume of the dig a lot.
Here is why the footprint matters. Say the house is 28 by 40 feet and the pad runs 5 feet past the house on every side for working room. That pad is 38 by 50 feet, or 1,900 square feet. Two feet of structural fill over it is 1,900 times 2, divided by 27, or about 141 cubic yards before compaction. Change the house to 32 by 48 and the pad becomes 42 by 58, or 2,436 square feet, and the fill grows to about 180 cubic yards. Without plans, the estimator has to guess which one you are building.
Septic design or perc results
The soils test decides what kind of system your lot takes, and the system decides how much digging there is. DEC's sizing table for conventional drainfields runs from 125 square feet per bedroom in clean gravel to 335 square feet per bedroom in silt. For a three-bedroom house, that is 375 square feet of drainfield on one lot and 1,005 on another.
If you have no test yet, the estimator can only exclude the septic or give a wide range. Schedule the test for the first thaw. Our post on the perc test explains the process, and our septic systems page covers installation.
Driveway, access, and permits
Tell the estimator whose road you are coming off. A borough road needs a KPB driveway permit, and the borough's minimum culvert is 15 inches by 30 feet. A state highway goes through Alaska DOT&PF. A private road may have its own rules. Our driveway permit post has the details.
Access notes save a wasted trip. Mention locked gates, low power lines over the driveway route, soft spots, and whether the road is plowed. In spring, borough weight restrictions can limit gravel trucks and equipment hauls.
Utility plan: power, gas, and water
Each utility runs on its own clock, and each affects the trenching.
| Utility | What to have ready | Why the estimator needs it |
|---|---|---|
| Power (Homer Electric) | Application filed, or at least the meter location | HEA stakes the route; the trench length and clearing follow it |
| Gas (ENSTAR) | Whether gas is available at your lot | ENSTAR asks for lot, block, and subdivision to check availability |
| Well | Planned location, kept 100 feet from the drainfield | Sets the waterline trench length |
| City water and sewer | Distance to the main and the city's rules | Sets the trench length and depth |
On gas, ENSTAR's service line page says a line can go in once the foundation is complete and backfilled to within 6 inches of finished grade, and new installations may take 2 to 4 weeks after the application and payment are received. Your backfill schedule has to line up with that. In Soldotna or Kenai, the city sets the connection rules, so ask for them before the estimate.
Photos, timeline, budget, and why winter is the time
Photos let the estimator spot problems before the site visit. Shoot the road approach from both directions, the building site, any wet ground, any steep pitch, and any old structures or debris. A phone video walking the driveway route works well.
Give a target start and tell the estimator what must happen first: the perc test, the HEA site visit, the permit. A budget range is useful too. It lets the contractor suggest options, such as building the driveway to a working surface now and finishing the top later.
Most new home site work waits for thawed ground, so winter is when excavation contractors plan their season. If your paperwork is ready by late winter, your estimate is ready before breakup and you can book a spot in the schedule. The owners with paperwork ready are the first ones a contractor can put on the calendar.
MNA Construction gives free estimates for excavation and earthwork on new home sites, driveways, and septic jobs from Soldotna across the peninsula. Send your checklist with what you have, even if some lines are blank, and we will tell you what else we need. Request your estimate here.
Common questions
- Can I get an excavation estimate without house plans?
- Yes, if you can give the footprint size, foundation type, and where the house will sit. Without those, the estimator has to assume a pad size and depth, and the number will come with allowances that can change. Final plans give the most accurate bid.
- Do I need a perc test before getting a septic estimate?
- For a firm number, yes. The test decides whether the lot takes a conventional or engineered system and how large the drainfield must be. Without it, a contractor can only give a range or leave the septic out of the bid.
- Are excavation estimates free?
- MNA Construction's estimates are free. Practices vary between contractors, so ask before the site visit whether there is a charge and what the estimate will include. A free estimate should still list scope, quantities, and exclusions.
- How many excavation bids should I get?
- Two or three is common for a new home site. More bids only help if every contractor prices the same scope, which is why sending each one the same checklist and documents matters. Compare exclusions first, then price.